Ò»¡¢
-> Receive customer¡¯s order
and sign the contract.
-> carry out design according to drawings supplied
by the customer or template supplied by our company.
-> carry out mould design and CNC programming
design according to 3D drawing.
-> CNC machining, define mould and mould parts
according to mould design drawings.
-> Mould-making technical
personnel begin to mechanical processing such as roughing
etc.
-> carry out mould fabrication
processes such as sparking on copper parts processed by
CNC, linear cutting of mould parts etc.
-> Mould simplification
and assembling enter into the first time die setting.
-> Project engineer gets the fodders from the
first time die setting and compares with the mould, prepare
the die-setting report and modification advice bases on
problem existed on structure and external technology.
-> The second die setting:
our company conduct proofing process of product, painting,
silk-screen printing according to customer¡¯s requirements£»the
customer will put forward modification advice upon receipt
of the first time template, and our company will then conduct
modifications on mould or technology according to customer¡¯s
advice.
-> The customer appraises the template and our
company will then carry out massive production according
to template appraised by the customer.
¶þ¡¢ the flow chart of plastic mould£º
|